13.1.5 Concluding steps
Perform the following procedures to complete the task:
Ê Close the front cage as described in section "Closing the front cage" on
page 62.
Ê Close the server cover as described in section "Closing the server" on
page 64.
Ê Reconnect the AC power cord to the power supply unit.
Ê Verify whether a backup copy of the system board settings has been
successfully transferred to the Chassis ID EPROM as described in section
"Verifying system information backup / restore" on page 86.
Ê Store your server’s system information on the Chassis ID EPROM
integrated into the front panel board. For further information on how to obtain
and use the ChassisId_Prom Tool, refer to section "Using the Chassis ID
Prom Tool" on page 102.
Ê Enable boot watchdog functionality as described in section "Enabling SVOM
boot watchdog functionality" on page 92.
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section "Enabling
BitLocker functionality" on page 99.