b = Packet switch unit 2 number
c = PSU2 shelf number
d = GQPH channel group number
e = QLPS network number
If the resultant state is
OOS-QLPSLB or OOS-LVL1-FRAME,
CONTINUE this procedure for further recovery.
Otherwise, RETURN to Step 1 because the status of multiple
GQPH QPipes may have been affected by hardware
reconfigurations.
............................................................................................................................................................
8
In a further attempt to isolate undetected problems in parent CM
hardware, attempt to conditionally restore each QLPS in target
network
d
RST:QLPS=a-d;
Where:
a = the ONTC side, noting the request may be denied because of
higher level problems.
If the conditional restore fails, then refer to the Corrective
Maintenance procedure, Clear Quad Link Packet Switch Problems,
235-105-220, to repair/restore the QLPS.
If either QLPS was repaired or restored, recheck target GQPH QPipe
status:
OP:STATUS,GQPHQPIPE,QPIPE=a-b-c-d-e;
Where:
a = Global switch module number
b = Packet switch unit 2 number
c = PSU2 shelf number
d = GQPH channel group number
e = QLPS network number
If the resultant state is
NOT OOS-QLPSLB or OOS-LVL1-FRAME,
then RETURN to Step 1 because the status of multiple GQPH QPipes
may have been affected by hardware reconfigurations.
Otherwise, attempt to conditionally switch QLPSs in the target
network:
Resolve GQPH QPipe Problems
Maintenance Considerations
....................................................................................................................................................................................................................................
7-52
Lucent Technologies 235-200-118
Issue 3.02B, March 2007