9-8
PTT switch and cowling lock lever
0
1
2
3
4
5
6
7
8
9
10
A
Removing the PTT switch
1. Remove the holder “1”, and then remove
the PTT switch “2”.
A. Regular rotation model
B. Counter rotation model
Removing the cowling lock lever
1. Remove the spring “1”.
2. Remove the lever “1” and cowling lock
lever “2”.
Removing the flushing hose
1. Remove the adapter “1” and hose joints
“2”, and “3”.
2. Remove the flushing hose “1”, PTT motor
leads “a”, trim sensor lead “b”, and grom-
met “2”.
Installing the flushing hose
1. Install the grommet “1” to the bottom
cowling.
STBD
1
2
A
PORT
1
2
B
1
1
2
1
2
3
2
a
b
1