176 Upgrade and Maintenance Manual TX120 S3
Expansion cards and backup units
for the Japanese market:
http://jp.fujitsu.com/platform/server/primergy/system/
9.2 Expansion cards
9.2.1 Installing expansion cards
9.2.1.1 Required tools
● Preliminary and concluding steps: tool-less
● Installing expansion cards: tool-less
9.2.1.2 Preliminary steps
Before installing an expansion card, perform the following steps:
Ê Disable BitLocker functionality as described in section "Disabling BitLocker
functionality" on page 79.
Ê Disable boot watchdog functionality as described in section "Disabling
SVOM boot watchdog functionality" on page 80.
Ê If applicable, verify existing LAN teaming configurations as described in
section "Configuring LAN teaming" on page 83.
Ê Shut down the server as described in section "Shutting down the server" on
page 58.
Ê Disconnect the AC power cord from the system.
Ê Remove the server cover as described in section "Opening the server" on
page 61.
Upgrade and Repair Units (URU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes