214 Upgrade and Maintenance Manual TX120 S3
Expansion cards and backup units
9.3.6.6 Concluding steps
Perform the following procedures to complete the task:
Ê Close the front cage as described in section "Closing the front cage" on
page 68.
Ê Close the server cover as described in section "Closing the server" on
page 70.
Ê Reconnect the AC power cord to the power supply unit.
Ê If applicable, update the firmware of the RAID controller that has been
connected to the FBU as described in section "Updating RAID controller
firmware" on page 91.
Ê Enable boot watchdog functionality as described in section "Enabling SVOM
boot watchdog functionality" on page 96.