EasyManua.ls Logo

Fujitsu PRIMERGY TX120 S3 - Concluding Steps; Replacing Memory Modules; Required Tools

Fujitsu PRIMERGY TX120 S3
440 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TX120 S3 Upgrade and Maintenance Manual 241
Main memory
10.3.4 Concluding steps
Perform the following procedures to complete the task:
Ê Close the server cover as described in section "Closing the server" on
page 70.
Ê Reconnect the AC power cord to the power supply unit.
Ê Enable boot watchdog functionality as described in section "Enabling SVOM
boot watchdog functionality" on page 96.
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section "Enabling
BitLocker functionality" on page 103.
10.4 Replacing memory modules
10.4.1 Required tools
Preliminary and concluding steps: tool-less
Replacing memory modules: tool-less
Upgrade and Repair Units (URU)
Average task duration: 5 minutes

Table of Contents

Other manuals for Fujitsu PRIMERGY TX120 S3

Related product manuals