9.4 Expansion cards in PCI slots
9.4.1 Installing expansion cards
9.4.1.1 Preliminary steps
Ê "Disabling or suspending BitLocker functionality" on page 77
Ê "Disabling SVOM boot watchdog functionality" on page 78
Ê "Shutting down the server" on page 48
Ê "Disconnecting the server from the mains" on page 48
Ê "Getting access to the component" on page 49
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Software: 5 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver