Figure 194: Closing the socket release lever
Ê Close the socket release lever (1) and latch it under the load plate retention
tab (2) to lock down the load plate.
Ê If applicable, install the second processor accordingly.
11.2.3 Concluding steps
Ê "Installing processor heat sinks" on page 288
Ê "Reassembling" on page 62
Ê "Connecting the server to the mains" on page 72
Ê "Switching on the server" on page 73
Ê "Updating or recovering the system board BIOS and iRMC" on page 85 (if
applicable)
Ê "Enabling SVOM boot watchdog functionality" on page 96
Ê "Enabling BitLocker functionality" on page 101