5B-24 - MERCARB 2 BARREL CARBURETOR 90-823225--1 1096
4. Recheck BOTH float level and float drop.
5. Carefully place air horn on float bowl, making
sure accelerator pump is correctly positioned in
fuel well. Lower air horn straight down to install.
72400
a
b
a - Air Horn Assembly
b - Float Bowl Assembly
6. Install seven short and one long air horn attach-
ing screws. Tighten screws evenly and securely.
72280
a
a
a
a
a - Air Horn Attaching Screws
7. Place end of choke rod in choke lever and collar
assembly.
72299
b
a
a - Choke Rod
b - Choke Lever and Collar Assembly
8. Place idle cam on choke rod.
72392
b
a
a - Idle Cam
b - Choke Rod