EasyManua.ls Logo

Mercury 305 CID - Page 790

Mercury 305 CID
967 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6B-16 - CLOSED COOLING MODELS 90-823225--1 1096
2. Install pulley on pump and secure with four
screws, lockwashers and clamping ring (some
models). Tighten screws finger-tight only at this
time.
3. Attach pump, mounting bracket and brace as-
sembly to engine. Do not tighten attaching
screws at this time.
4. Torque pump pulley attaching screws.
5. Position drive belt on pulleys and adjust belt ten-
sion as outlined in “Drive Belt Tension Adjust-
ment.”
6. Connect seawater inlet hose to lower fitting on
pump.
7. Connect outlet hose to upper fitting on pump.
8. Tighten hose clamps securely.
9. If applicable, reinstall power steering drive belt.
Adjust tension as outlined in “Drive Belt Tension
Adjustment.”

Table of Contents

Related product manuals