EasyManua.ls Logo

NEC iPASOLINK EX Advanced - Page 391

NEC iPASOLINK EX Advanced
793 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8-72 Set ETH Function
GGS-000547-01E iPASOLINK EX Advanced: SET NETWORK AND SYSTEM PROVISIONING
5. When completed, click the OK button.
6. Confirmation dialog box appears. Click the OK button to proceed.
Figure 8-96 Confirmation Dialog Box
7. Information dialog box appears. Click the OK button to proceed.
Figure 8-97 Information Dialog Box
The ETH OAM Setting window updates the information.
8. Confirm that the modified parameter(s) is/are displayed.
Figure 8-98 ETH OAM Setting Window — OAM MEP Tab
This step ends the procedure.

Table of Contents