CONTROL ITEMS 4-99
iPASOLINK EX Advanced: OPERATION & MAINTENANCE GGS-000548-01E
4.9.3 Switch (Swap) Program ROM
4.9.3.1 Switch (Swap) BB ROM
Proceeding through the following terminates the WebLCT and restarts
iPASOLINK EX/A.
Important:
To operate the Program ROM Switching, the system must be set into the
Maintenance mode; Do not cancel the Maintenance mode while controlling
the switching operation.
Procedure 4-29
1. Click the Maintenance tool button on the tool bar of the WebLCT to put the
system into the Maintenance Mode. The
MAINT indicator on the tool bar
changes to orange.
2. In the
MENU frame on the left, expand the Equipment Utility to select
Program ROM Switching. The Program ROM Switching window appears.
3. Click the
BB link in the Item field.
Figure 4-166 Program ROM Switching Window
The Program ROM Switching (BB) option window appears.