CONTROL ITEMS 4-23
iPASOLINK EX Advanced: OPERATION & MAINTENANCE GGS-000548-01E
4.4.5 Timing Source Switch Control
4.4.5.1 Unlock the Mode
Operate this Procedure 4-8 if the equipment is in the Lockout mode. Otherwise, skip
this procedure, and go to
Procedure 4-9 provided in 4.4.5.2 Switch Timing
Sources
.
Procedure 4-8
1. Launch and log in to WebLCT.
2. Click the
Maintenance button on the top of the WebLCT window to switch the
state to the maintenance mode. See
4.2.1 Change to Maintenance Mode (for
WebLCT Operation)
for operating steps.
3. In the
MENU frame on the left, expand Maintenance Control, then its
submenu
Protection Control to select Timing Source Switch Control. The
Timing Source Switch Control window appears.
4. If the target facility is locked (Lock Out indicates On), click the link. If it is not
locked (Lock Out indicates Off), go to 4.4.5.2 Switch Timing Sources
Figure 4-33 Timing Source Switch Control Window
Timing Source Switch Control
option window appears.