EasyManua.ls Logo

NEC Univerge SV9100 - Page 103

NEC Univerge SV9100
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UNIVERGE SV9100 Issue 1.2
System Hardware Manual 3 - 31
4. Align the upper and lower bracket holes with the heads of
anchor bolts mounted on the wall and slide downward
(refer to Figure 3-40 Install Screws (Option 2)).
5. Connect grounding wire to chassis. Refer to Chapter 4 paragraph 1.3
Installing the 9.5” Chassis on page 3-18 for complete details on
grounding the system.
6. Refer to 2.1 Installation and Safety Precautions on page 4-3 for
installation of blades.
2.2.2.2 Wall Mounting the CHS2UG with the CHS2UG B Small Batt
Box
To install the CHSGW SMALL BATT BOX refer to section 6.3
Installing the CHSGW SMALL BATT BOX on the 9.5” Chassis
on page 3-70
1. Align the bracket halves (refer to Figure 3-37 Wall
Figure 3-40 Install Screws (Option 2)

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals