Issue 1.2 UNIVERGE SV9100
3 - 8 Installing the SV9100 Chassis
9. Close the GPZ-BS10 cover.
1.1.2.3 Install the GPZ-BS11 Expansion Blade in the CHS2UG
Expansion Chassis
Figure 3-11 GPZ-BS10 Blade Installed
Figure 3-12 GPZ-BS10 Installed (Cover Closed)
Figure 3-13 f Components
For the Expansion Chassis to function, the
GPZ-BS10 blade must be installed in Controlling
Chassis.