Issue 1.2 UNIVERGE SV9100
3 - 50 Installing the SV9100 Chassis
6. Turn the 9.5 inch chassis over and place in the location to be installed.
7.
Secure the 9.5” assembly to a flat surface with the four screws supplied.
8. Connect grounding wire to chassis. Refer to Chapter 4 paragraph 1.2
Installing the 9.5” Base (CHS2UG) Chassis on page 3-16 for complete
details on grounding the system.
9. Refer to 1.1.5 Install AC Power Cords on 19” Chassis on page 3-15 for
installation of the power cord or, Chapter 6 paragraph 2.1 Installation and
Safety Precautions on page 4-3 for installation of blades.
SECTION 5 RACK MOUNTING THE CHASSIS
5.1 Rack Mounting the 19” (CHS2UG) Chassis
A single or multiple chassis can be rack mounted. Controlling and Expansion
chassis can be racked mounted by stacking them horizontally.
1. The 19” chassis requires two rack mount brackets per chassis for mounting.
Each 19" chassis requires its own set of rack mount bracket(s). Refer to
Figure 3-64 Stand Mount 9.5” Chassis
To prevent possible damage to the 19” chassis due to falling, NEC
recommends screws be installed in the stand mount brackets as soon
as possible.