Issue 1.2 UNIVERGE SV9100
3 - 60 Installing the SV9100 Chassis
3. Align bolt holes in CHS BASE UNIT (see figure below) with holes
drilled in floor and secure using four anchor bolts.
4. Align and install the CHS LARGE BATT BOX on top of the CHS BASE
UNIT.
5. Secure the CHS LARGE BATT BOX to the CHS BASE UNIT using the
CHS2UG JOINT BRACKET KIT. Refer to figure below.
6.2.2 Battery Installation
1. Loosen screw on front of CHS LARGE BATT BOX.
2. Swing cover outward and detach from CHS LARGE BATT BOX.
Figure 3-79 Installing the CHSG LARGE BATT BOX using the CHS2UG JOINT BRACKET KIT
Figure 3-80 Removing CHSG LARGE BATT BOX Cover