Issue 1.2 UNIVERGE SV9100
4 - 62 Installing the SV9100 Blades
64 Kb/s Clear B-Channel and 16 Kb/s D-Channel
Two Status LEDs
Connector for PZ-2BRIA
These trunk circuits can be connected to either ISDN trunks or ISDN
telephones, depending on the switch setting within system
programming. All ISDN telephone circuits (#1-2 and #3-4 with the
BRI daughter board) are supplied DC power from the system.
The BRI Interface blade uses a single universal slot. Each blade
connects to the network via an NTI Network Termination.
In order to block new calls on the blade, system programming must
be used. This program will prevent new calls from being established
on the blade, but it will not terminate any existing calls.
With the maximum number of blades installed, the following can be
provided:
. The 2BRI provides 30 BRI circuits and 60 BRI channels.
Table 4-31 GCD-2BRIA Maximum Upgrade Capacities provides the
maximum capacities for the GCD-2BRIA blade when they are
upgraded.
5.3.2 Installation
To install the GCD-2BRIA
:
1. Plug the GCD-2BRIA blade into the system chassis.
2. Before proceeding to Step 3, wait to verify that the STATUS
LED starts to flash. (Refer to Figure 4-16 GCD-2BRIA Blade
on page 4-61 for the location of the LEDs on the blade.)
Table 4-31 GCD-2BRIA Maximum Upgrade Capacities
19” Chassis
with CPU
19” Chassis
without CPU
19” Chassis
x4
Networked
Chassis
5 6 23 25