EasyManua.ls Logo

NEC Univerge SV9100 - Installation

NEC Univerge SV9100
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 1.2 UNIVERGE SV9100
4 - 74 Installing the SV9100 Blades
Basic PRI Call Control (BCC)
Display of incoming caller’s name and number (when allowed by the
telco)
Speech and 3.1 KHz audio
When installed, GCD-PRTA uses the first block of 32 consecutive
trunk ports. For example, if a COIU blade is installed for trunks 1~8,
the GCD-PRTA automatically uses trunks 9~40. If the COIU blades
are installed for trunks 1~8 and 17~24, GCD-PRTA uses trunks
25~56. The GCD-PRTA cannot use trunks 9~16 (even if available)
since they are not part of a consecutive block of 32 trunks. Each
GCD-PRTA requires 32 ports in the system, even if not all the ports
are used, otherwise the blade does not function.
The GCD-PRTA requires one universal slot.
Table 4-39 GCD-PRTA Maximum Upgrade Capacities provides the
maximum capacities for the GCD-PRTA blades when they are
upgraded.
5.6.2 Installation
To install the GCD-PRTA:
1. Plug the GCD-PRTA into any universal slot on the chassis.
2. Use Program 10-51-01 (PRI/T-1) to set the GCD-PRTA blade
to either PRI.
3. Connect the cable from the NT1 Network Termination cable to
the CN2 connector on the GCD-PRTA. (Refer to Figure 4-20
PRI Layout for NT-1 Network on page 4-75 for a cabling
Table 4-39 GCD-PRTA Maximum Upgrade Capacities
19” Chassis
with CPU
19” Chassis
without CPU
19” Chassis
x4
Networked
Chassis
3368
With normal operation, LED 1 flashes green.

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals