Issue 1.2 UNIVERGE SV9100
6 - 60 Installing SV9100 Optional Equipment
11.6.2 GBA-L UNIT Connection
The following chart outlines the connectivity available to the GBA-L
UNIT:
11.6.3 LED Display
The following provides a list of each LED and associated operation
and status indications. Refer to Figure 6-63 GBA-L UNIT LED
Display on page 6-61 for the location of the LEDs on the GBA-L
UNIT.
Figure 6-62 GBA-L UNIT Connectivity Chart