EasyManua.ls Logo

NEC Univerge SV9100 - Battery Connection; Installing the Internal Batteries 19 (CHS2 UG) Chassis

NEC Univerge SV9100
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UNIVERGE SV9100 Issue 1.2
System Hardware Manual 3 - 53
7. Refer to 1.1.5 Install AC Power Cords on 19” Chassis on page 3-15 to
continue installation of the chassis or, Chapter 6 paragraph 2.1 Installation
and Safety Precautions on page 4-3 for installation of blades.
SECTION 6 BATTERY CONNECTION
Two types of battery connection provide battery life during a power failure, the internal
battery and an external battery with CHS LARGE BATT BOX.
6.1 Installing the Internal Batteries 19” (CHS2UG) Chassis
An internal battery source using two batteries can be installed using the CHS2UG
BATT MTG KIT (mounting kit) and CHS2UG BATT CABLE INT (internal cabling).
CHS2UG BATT MTG KIT (Backup time = 10 Minutes/24 Terminals)
1. Power down the CHS2UG chassis
2. Disconnect AC power and grounding cable from rear of chassis.
3. Remove screws from battery access panel on rear of chassis.
Ensure the CHS2UG chassis is powered OFF.
Figure 3-68 Removing Battery Access Panel

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals