EasyManua.ls Logo

NEC Univerge SV9100

NEC Univerge SV9100
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UNIVERGE SV9100 Issue 1.2
System Hardware Manual 3 - 17
m Stand-mounted refer to 4.2 Stand Mounting the 9.5” CHS2UG B Chassis on
page 3-46.
From the factory, the SG, ETH and PBXG grounds are located inside the chassis
and are connected to the FG (frame ground) on the back of the chassis.
1.2.1 Install Grounding on 9.5” Chassis
1. Ensure the 9.5” chassis is powered off and the AC power cord is
unplugged.
2. Ground the chassis by connecting a 14 AWG wire from the FG lug on
the back side of the chassis to an electrical service ground (such as a
cold water pipe). Refer to Figure 3-27 9.5” Chassis (Rear View).
Figure 3-26 9.5” Chassis (Front View)
Figure 3-27 9.5” Chassis (Rear View)
3 Universal Slots
(Slot 1 for CPU)
Power Switch
and LED
Ground
AC Inlet
For External Battery
(12V Connection)
CHS2UG
Chassis

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals