EasyManua.ls Logo

NEC Univerge SV9100

NEC Univerge SV9100
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 1.2 UNIVERGE SV9100
4 - 68 Installing the SV9100 Blades
2. Before proceeding to Step 3, wait to verify that the STATUS
LED starts to flash.
3. Connect the cable from the NT1 Network Termination cable to
the CN7 or CN8 connector on the GCD-2BRIA and/or
PZ-2BRIA daughter board.
5.4.3 Connectors
Table 4-35 PZ-2BRIA RJ-45 T-Bus Cable Connector Pin-Outs show
the pin-outs for the RJ-45 cable connector for S-Bus and T-Bus
connections. Refer to Figure 4-17 Installing the PZ-2BRIA Daughter
Board on page 4-66 for an illustration showing the location of the
connectors on the PZ-2BRIA daughter board.
Table 4-35 PZ-2BRIA RJ-45 T-Bus Cable Connector Pin-Outs
RJ-45 Cable Connector – CN2
S-Bus Connection
Pin No. Connection
1—
2—
3RA
4TA
5TB
6RB
7—
8—
With normal operation, the status LED
flashes fast. If trouble was found during
the self diagnostics routine, the status
LED flashes slow.
Once connected, the PKG LED will not
be indicated for the status of Layer 1 link.

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals