System Hardware Manual 3 - 1
Chapter
3
Installing the SV9100 Chassis
SECTION 1 GENERAL INFORMATION
This chapter contains information to help the technician install the chassis
for the SV9100 system. The technician should be familiar with this section
before installing any equipment.
1.1 Installing the 19” (CHS2UG) Chassis
The CHS2UG chassis has six universal blade slots for legacy line/trunk
blade (Single Line Telephone Interface, Digital multiline terminal
Interface, Central Office Trunk, ISDN PRI Interface, etc.). In-skin
Application Blades (In-skin UMS, In-Skin Router, etc.). It also houses
the BUS Interface Blade, Power Supply Unit (PSU) and Cooling Fan.
When the GCD-CP10 blade is installed in the first 19” chassis, it is
called the controlling chassis. Additional chassis, called expansion
chassis, can be installed to increase the capacity of the system to meet
the customer’s business needs. Each chassis (Expansion or
Controlling), is powered by an MPS7101 power supply.