Issue 1.2 UNIVERGE SV9100
3 - 16 Installing the SV9100 Chassis
1.1.6 Install AC Power Cords on Multiple 19” Chassis (Optional)
To install the AC power cords, locate the supplied AC power cords and
attach to the AC Inlets located on the back of the Controlling and Expansion
Chassis.
1.1.7 Install Additional Blades 19” Chassis
Refer to Chapter 4, 2.1 Installation and Safety Precautions on page 4-3.
1.1.8 Apply Power to the 19” Chassis
Refer to Chapter 4, 2.6 Powering Up the SV9100 on page 4-9.
1.2 Installing the 9.5” Base (CHS2UG) Chassis
The CHS2UG chassis have three universal blade slots for station, trunk and
optional blades.
Before proceeding with installation of chassis, ensure site preparation is
completed. The Gateway (CHS2U GW) chassis can be:
m Wall-mounted – refer to 2.2 Wall Mounting the 9.5” Chassis on page 3-25.
m Stand-mounted – refer to 4.2 Stand Mounting the 9.5” CHS2UG B Chassis on
page 3-46.
The Base (CHS2UG) chassis can be:
m Wall-mounted – refer to 2.2 Wall Mounting the 9.5” Chassis on page 3-25.
Figure 3-25 Install 19” AC Power Cords (Multiple-Chassis)