EasyManua.ls Logo

NEC Univerge SV9100 - Page 131

NEC Univerge SV9100
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UNIVERGE SV9100 Issue 1.2
System Hardware Manual 3 - 59
1. Use the template shown in below for required spacing before drilling
holes for 0.39” (10mm) anchor bolts (locally procured).
2. Mark and drill the four holes required to install the CHS BASE UNIT.
m Because of injury from falling equipment, wall mounting
the CHSG LARGE BATT BOX is not recommended.
m Mounting the CHSG LARGE BATT BOX directly on the
floor is not recommended.
m The CHS BASE UNIT raises the height of the CHSG
LARGE BATT BOX 120mm (4.72”).
m When the CHSG LARGE BATT BOX and CHS2UG are
connected for long term use, the CHS2UG JOINT
BRACKET KIT is used.
Figure 3-78 Floor Mount Spacing Guide

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals