Issue 1.2 UNIVERGE SV9100
3 - 40 Installing the SV9100 Chassis
1. Install the five rubber feet to the bottom of each chassis.
2. Using supplied screws in the CHS2UG JOINT BRACKET KIT, attach
metal brackets to both ends of the 19” chassis and the CHS BASE
UNIT. Refer to figure below.
3. Connect the ground wire to all chassis. Refer to 1.1.3 Install
Grounding on 19” Chassis on page 3-13 for complete details on
grounding the system.
4. Refer to 1.1.5 Install AC Power Cords on 19” Chassis on page 3-15 to
Figure 3-51 Install Rubber Feet for Multiple Chassis
Figure 3-52 Install Metal Brackets with Screws