2. Push down on the battery, opposite from the plus (+) symbol
(refer to Figure 4-5 GCD-CP10 Battery Installation).
Battery Removal
1. Ensure backup of SRAM data on GCD-CP10
.
When removing the backup battery, SRAM data and system
clock are initialised. Use the following to store the SRAM data
(Reconfigure the system clock after replacing the battery).
2. Power off the system and remove the GCD-CP10 from the
chassis.
Before removing the GCD-CP10 from the
chassis to install or replace a battery,
ensure the system is powered Off.
When removing the backup battery,
SRAM data and system clock are
initialized. Make a backup of the SRAM in
advance and configure the system clock
after battery replacement.
Replace the battery every 6 years.
Contact the reseller where you bought the
product for a replacement battery.
The following SRAM data types are important
for the client. If stored, this procedure must be
used to restore the data.
Billing memory
SMDR Billing data
Table 4-5 SRAM Data Types
SRAM Data Measure
Fault Information
Read the fault information using the PCPro “Fault
Display” menu.
OAI FLF Memory
Save the memory by specifying “DBM data (PHS/OAI)”
in the PCPro “System Data Save/Load Verify” menu.
Billing Memory Print the billing memory using an external printer.
SMDR Billing Data Delete the billing data using SMDR/CR1000.