EasyManua.ls Logo

NEC Univerge SV9100 - Page 306

NEC Univerge SV9100
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 1.2 UNIVERGE SV9100
5 - 46 Installing DT Series Digital and IP Multiline Terminals
5. Install the Line Cord in the groove. Refer to Figure 5-36 Line
Cord Groove (DT400).
6. Turn the terminal over and place it so the Line Cord can be
passed through the groove between the tilt legs. Refer to
Figure 5-34 Line Cord Groove Back of Terminal (DT300) on
page 5-45.
Figure 5-35 Installing the Line Cord (DT400)
Figure 5-36 Line Cord Groove (DT400)

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals