6 - 8 Installing SV9100 Optional Equipment
9. Install a modular jack for each PGD(2)-U10 ADP. For each module, run
one-pair 24 AWG station cable from the cross-connect block to a
modular jack. Ground the unused pair.
10. Terminate the extension leads to GRN/RED of the modular jack.
Terminate the unused leads to the jack.
11. Install bridging clips as required.
. For the module to ID correctly, set the circuit type to 0 for the port in Program
10-03-01 prior to connecting the line cord.
12. Plug a modular line cord from the mod jack to the CN1 connector on the
PGD(2)-U10 ADP.
13. Optional:
To wall mount the PGD(2)-U10 ADP, insert two wood screws 100mm
apart (3 15/16”). Leave 3mm (1/8”) of the screw exposed. The screws
can be installed either vertical or horizontal, depending on which position
Figure 6-7 PGD(2)-U10 ADP Connections