Issue 1.2 UNIVERGE SV9100
6 - 16 Installing SV9100 Optional Equipment
4. Terminate the extension leads to GRN/RED of the modular jack.
Terminate the unused leads to the jack.
5. Install bridging clips as required.
6. Plug a modular line cord from the mod jack to the CN1 connector on the
PGD(2)-U10 ADP.
7. Connect the two-conductor station cable from the CN5 connectors within
the PGD(2)-U10 ADP to the external relay/external page.
Figure 6-13 PGD(2)-U10 ADP Cable Connection