EasyManua.ls Logo

NEC Univerge SV9100 - Page 84

NEC Univerge SV9100
478 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 1.2 UNIVERGE SV9100
3 - 12 Installing the SV9100 Chassis
1. Ensure Controlling and Expansion chassis are powered
down.
2. Using the NEC provided CAT5 straight-through cable(s),
attach one end to each Expansion Chassis CN2 connector
on the GPZ-BS11 blade (see Figure 3-21 System Expansion
Cabling on page 3-13). Attach the opposite end to the CN2,
CN3 or CN4 connector on the GPZ-BS10 of the Controlling
Chassis.
Figure 3-20 19” Expansion Chassis Interface Units
Expansion Chassis Interface Unit
for the Controlling Chassis
GPZ-BS10
Expansion Chassis Interface Unit
for the Expansion Chassis
GPZ-BS11

Table of Contents

Other manuals for NEC Univerge SV9100

Related product manuals