EasyManuals Logo

GE LOGIQ 7 Basic User Manual

GE LOGIQ 7
984 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #80 background imageLoading...
Page #80 background image
Preparing the System for Use
3-22 LOGIQ 7 Basic User Manual
Direction 2392206-100 Rev. 1
Power Off
To power off the system:
1. Press the Power On/Off switch at the front of the system
once.
2. The System-Exit window is displayed.
3. Using the Trackball, select Shutdown.
The shutdown process takes a few seconds and is
completed when the Power On/Off switch illumination is
turned amber.
4. Disconnect the probes.
Clean or disinfect all probes as necessary. Store them in
their shipping cases to avoid damage.
NOTE: When the Uninterruptible Power Supply (UPS) is installed,
battery replacement may be necessary if the circuit breaker is
turned off for long periods of time (3 to 6 months).
CAUTION
DO NOT turn off the circuit breaker before the Power On/Off
switch LED is off.
Data may be lost or system software damaged if the circuit
breaker is turned off before the Power On LED is off.

Table of Contents

Other manuals for GE LOGIQ 7

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ 7 and is the answer not in the manual?

GE LOGIQ 7 Specifications

General IconGeneral
BrandGE
ModelLOGIQ 7
CategoryMedical Equipment
LanguageEnglish

Related product manuals