EasyManua.ls Logo

IBM SAN Volume Controller - The Captive Thumbscrews that Secure the Node and the Shipping Brackets; Aligning the SAN Volume Controller 2145-8 G4 with the Rack Slides

IBM SAN Volume Controller
334 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Align the two rear wheels on the node with the opening in the slides and then push the node into the
slides until the rear slide release latches (2 in Figure 44) click into place, locking the node in the
slides.
4. Reconnect the fibre-channel and Ethernet cables. Ensure that you replace the fibre-channel and
Ethernet cables in the same ports from which they were removed.
Figure 43. The captive thumbscrews that secure the node and the shipping brackets
svc00236
Figure 44. Aligning the SAN Volume Controller 2145-8G4 with the rack slides
Chapter 2. Removing and replacing parts 53

Table of Contents

Related product manuals