EasyManuals Logo

IBM SAN Volume Controller User Manual

IBM SAN Volume Controller
334 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #89 background imageLoading...
Page #89 background image
3. Insert one of the M6 screws into the front and rear locking latches and tighten.
4. Repeat the instructions in steps 1 on page 61 through 3 with the right support rail.
Installing the support rails for the SAN Volume Controller 2145-8G4
You must install the support rails that hold the SAN Volume Controller 2145-8G4.
When you are ready to install the support rails, use the customer's hardware-location chart and the
Electronic Industries Alliance (EIA) positions on the rack to determine where in the rack that the SAN
Volume Controller node is to be installed.
Perform the following steps to install the support rails (shown in Figure 59 on page 64) for the SAN
Volume Controller 2145-8G4:
1. Make sure you have all the items that you need for installing the support rails.
Figure 58. Aligning the pins on the left front support rail for the SAN Volume Controller 2145-8A4 with the front
mounting flange
Chapter 2. Removing and replacing parts 63

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM SAN Volume Controller and is the answer not in the manual?

IBM SAN Volume Controller Specifications

General IconGeneral
Product NameIBM SAN Volume Controller
CategoryStorage
Storage VirtualizationYes
RAID SupportYes
Compression SupportYes
Encryption SupportYes
Host InterfaceFibre Channel, iSCSI, FCoE, SAS
RAID LevelsRAID 0, 1, 5, 6, 10
Maximum Cache Per System2TB
Supported Drive TypesSSD
High AvailabilityYes

Related product manuals