EasyManuals Logo

Juniper EX9208 Hardware Guide

Juniper EX9208
396 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #291 background imageLoading...
Page #291 background image
CHAPTER 25
Replacing Cable Management Bracket
Installing Cable Management Brackets on an EX9208 Switch on page 267
Removing Cable Management Brackets from an EX9208 Switch on page 268
Installing Cable Management Brackets on an EX9208 Switch
Before you install cable management brackets on the switch:
Ensure you understand how to prevent electrostatic discharge (ESD) damage. See
“Prevention of Electrostatic Discharge Damage” on page 351.
Ensure that you have the following parts and tools available to install cable management
brackets on an EX9208 switch chassis:
ESD grounding strap
Phillips (+) screwdriver, number 1 and 2
The cable management brackets attach to both sides of the switch. To install the cable
management brackets (see Figure 90 on page 268):
1. Attach the ESD grounding strap to your bare wrist, and connect the strap to the ESD
point on the chassis.
2. Position the cable management brackets on the front sides of the chassis.
3. Insert the tabs into the slots.
4. Tighten the captive screws completely.
267Copyright © 2017, Juniper Networks, Inc.

Table of Contents

Other manuals for Juniper EX9208

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Juniper EX9208 and is the answer not in the manual?

Juniper EX9208 Specifications

General IconGeneral
BrandJuniper
ModelEX9208
CategorySwitch
LanguageEnglish

Related product manuals