CHAPTER 25
Replacing Cable Management Bracket
•
Installing Cable Management Brackets on an EX9208 Switch on page 267
•
Removing Cable Management Brackets from an EX9208 Switch on page 268
Installing Cable Management Brackets on an EX9208 Switch
Before you install cable management brackets on the switch:
•
Ensure you understand how to prevent electrostatic discharge (ESD) damage. See
“Prevention of Electrostatic Discharge Damage” on page 351.
Ensure that you have the following parts and tools available to install cable management
brackets on an EX9208 switch chassis:
•
ESD grounding strap
•
Phillips (+) screwdriver, number 1 and 2
The cable management brackets attach to both sides of the switch. To install the cable
management brackets (see Figure 90 on page 268):
1. Attach the ESD grounding strap to your bare wrist, and connect the strap to the ESD
point on the chassis.
2. Position the cable management brackets on the front sides of the chassis.
3. Insert the tabs into the slots.
4. Tighten the captive screws completely.
267Copyright © 2017, Juniper Networks, Inc.