Minebea Intec X3 - Page 244

Minebea Intec X3
362 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Note:
See Chapter 12.2
Example:
The gross weight should be read.
I/O size = 8 bytes, counted from byte 0–7
7.18.5.2 DeviceNet settings for Rockwell workstation
Requirements:
- PR 1721/34 DeviceNet is installed.
- The parameters are selected and saved.
Procedure:
Note:
See Chapter
12.2
Example:
The gross weight should be read.
I/O size = 8 bytes, counted from byte 0–7
7.18.5.3 ProfiNet I/O settings for S7
Requirements:
- PR 1721/36 ProfiNet I/O is installed.
Procedure:
NOTICE
Potential network problems
A unique device name must be assigned for the hardware configuration and
assignment/download.
1. Register the file "sag_5410.eds" using the "Hardware Installation Tool".
2. Select and insert the instrument from the catalog into the I/O configuration.
1. Establish communication with the PLC (here: SIEMENS S7-300/400 or S7-1500).
2. Enter the IP address and network mask under
- [Fieldbus parameter] and
confirm.
3. Add the PR 5410 device to the project and assign the I/O ranges.
X3 Process Indicator PR 5410 7 Getting started
EN-242 Minebea Intec