UNIVERGE SV9100 Issue 1.2
System Hardware Manual 6 - 41
7. Using the exposed Bottom Option Interface as a guide, install
the APR-L UNIT in the bottom of the DTL multiline terminal.
Push down until left and right tabs are seated (Refer to Figure
6-32 Install APR-L UNIT).
8. Return tilt leg to original position.
9. For the APR adapter to be recognized correctly, before
plugging in the keyset, make sure the extension number to be
used for the adapter is undefined in Program 10-03-01.
10. Plug the line cord back into the keyset.
11. Using the ferrite bead that was included with the APR Adapter,
wrap the line cord once through the ferrite bead and snap it
shut (refer to Figure 6-33 Ferrite Bead with APR Adapter on
page 6-42).
Figure 6-31 Bottom Option Interface Knockout
Figure 6-32 Install APR-L UNIT