4535 612 10261 HD11 Service Manual Page 108
CSIP: Level 2 Installation: Physical Installation Procedures
Figure 5-16 Removing the Hold-down Brace Bolts
8. Remove the two 9/16-inch bolts
securing the hold-down brace to the
top-side of the ramp. Proceed to
step 9.