4535 612 10261 HD11 Service Manual Page 271
CSIP Level 1 Disassembly and Reassembly: Disassembly Procedures
Figure 10-84 Covering the System with an Antistatic Bag
11. Place an antistatic bag over the sys-
tem and adjust the bag so that there
is ample slack on all four sides. This
is critical in order for the system
hold-down brace to fit properly.
NOTE With the exception of the cast-
ers, the bag must cover every
part of the system that con-
tacts the crate.
Proceed to step 12.