4535 612 10261 HD11 Service Manual Page 81
CSIP Level 1 Installation: Inspecting the System
NOTE Before uncrating the system, ensure the area in front of the shipping crate ramp is clear
for at least 2.74 m (9 ft). (The ramp is the front side and is labeled “OPEN THIS
END.”)
Uncrating
Uncrate the system by following the instructions in “Uncrating the HD11 Ultrasound System”
on page 103. (Instructions for re-crating the system for shipment are provided in Section 10,
“Disassembly and Reassembly”.)
Inspecting the
System
After the system is uncrated (“Uncrating the HD11 Ultrasound System” on page 103), conduct
the following inspections. Report any damage or missing inventory to the carrier and to the
Philips Ultrasound traffic department.
WARNING Dangerous voltages are present inside the system. Do not install the system power cord or con-
nect it to AC line voltage until correct line voltage has been verified, a thorough inspection of the
system has been performed, and the system has been properly assembled.
➤ To inspect the system after uncrating
1. Inventory the shipment against the packing list.
2. Inspect the outside surfaces of the system, monitor, and peripherals for damage.
3. Unlatch and rotate the control panel to verify that proper left and right swivel and up/down
movement.
4. Verify that the system rolls and turns smoothly on its casters.
5. Verify that proper caster brake and swivel operation.
6. Remove the system covers.
7. Remove any loose packing material, dust, or debris from the interior of the system.