4535 612 10261 HD11 Service Manual Page 139
CSIP Level 1 Performance Tests: Test and Inspection Matrices
Software X:P No Yes See Ta b l e 6- 3. Run only after loading software.
E-box E:P Ye s Ye s S e e Tab le 6 -3 .
Cart C:P Ye s Ye s S e e Ta b le 6 -3 .
Table 6-2 When to Perform Tests—Summary (Continued)
Test Name
Test Code
(Ta bl e 6 -1 ) PM Tasks
Install/
Upgrade
Other
Service
Events Comments
Table 6-3 When to Perform Tests—Details
Test Block Name
(Symbol)
After a
PM Task
After an
Installation
or Upgrade Other Situations Requiring Testing
Sv:
(System Visual Inspection)
Ye s Ye s In any situation where the service engineer or customer suspects
that the system or transducers may have sustained physical damage.
Sgc:
(System Ground
Continuity)
No Ye s • Whenever a component was changed that is part of the main
power circuitry:
-Power cord
- Power supply
- Power cable from rear of cart to power supply
• In any situation where the CE (or customer) suspects that the
electrical safety of the system may have been compromised.
NOTE: System Ground Continuity is not required after
software-only installations or upgrades.