EasyManuals Logo

Promise Technology VTRAK E610f User Manual

Promise Technology VTRAK E610f
434 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #276 background imageLoading...
Page #276 background image
VTrak E-Class Product Manual
258
4. Press Y to continue.
The screen will display shutdown and startup functions.
5. When the
Login: prompt appears, log into the CLU again.
Restarting – RAID with JBOD Expansion, Serial
To restart multiple subsystems:
1. From the Main Menu, highlight Additional Info and Management, and press
Enter.
2. Highlight Shutdown or Restart and press Enter.
3. Press the spacebar to display Shutdown then press Enter.
A warning message appears.
4. Press Y to continue.
The screen displays shutdown functions.
5. If you have other VTrak RAID Subsystems, repeat the same procedure for
each of them.
6. Wait for two to three minutes, then turn off the power switches for all
subsystems.
7. Wait 30 seconds, then turn on the power switches on all JBOD
subsystems.
8. Wait 30 more seconds, then turn on the power switches on the RAID
subsystem.
9. When the
Login: prompt for the Head Unit appears, log into the CLU
again.
Warning
Do not restart the VTraks during a firmware upgrade procedure.
Wait until the upgrade is one and you are prompted to restart.

Table of Contents

Other manuals for Promise Technology VTRAK E610f

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Promise Technology VTRAK E610f and is the answer not in the manual?

Promise Technology VTRAK E610f Specifications

General IconGeneral
BrandPromise Technology
ModelVTRAK E610f
CategoryStorage
LanguageEnglish

Related product manuals