EasyManua.ls Logo

Sailor 100 - Page 130

Sailor 100
262 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation check list: Antenna
7-2 Chapter 7: Installation check 98-137654-A
7.
Make sure that the
requirements for mast
foundation and height,
including flatness, gusset
plates and distance from
welding seams are met.
See ADU mast design:
Foundation and height on
page 3-7.
8.
Make sure that the distances to
radar, Inmarsat systems, GPS
receivers and other
transmitters are as required.
See Interference on page 3-
12.
9.
Make sure that the drain tube
is open and risk for water
intrusion is at a minimum.
See Other precautions on
page 3-16.
10.
Check that the ADU is
grounded correctly, using the
mounting bolts.
See Grounding the ADU on
page 3-22
and
Grounding and RF
protection on page B-1.
Step Task Further information Done
Table 7-1: Installation check list: Antenna (Continued)
SAILOR100TM.book Page 2 Tuesday, January 29, 2013 2:44 PM

Table of Contents

Other manuals for Sailor 100