98-137654-A 3-1
Chapter 3
3333
Installation
Installation 3
This chapter is organised in the following sections:
Unpacking
Site preparation
Installation of the ADU
Installation of the ACU
Installation of the Control Panel
3.1 Unpacking
3.1.1 What’s in the box
3.1.1.1 ADU
Unpack your SAILOR 100 Satellite TV ADU and check that the
following items are present:
ADU with 4 lifting brackets (already mounted)
Package with bolts, washers and cable glands (2 sizes)
3.1.1.2 ACU
Unpack your SAILOR 100 Satellite TV ACU and check that the
following items are present:
1 x Ethernet cable (2 m)
Power connector
NMEA multi-connector
Installation manual (this manual)
User manual