98-137654-A 3-1
Chapter 3
3333
Installation
Installation 3
This chapter is organised in the following sections:
• Unpacking
• Site preparation
• Installation of the ADU
• Installation of the ACU
• Installation of the Control Panel
3.1 Unpacking
3.1.1 What’s in the box
3.1.1.1 ADU
Unpack your SAILOR 100 Satellite TV ADU and check that the
following items are present:
• ADU with 4 lifting brackets (already mounted)
• Package with bolts, washers and cable glands (2 sizes)
3.1.1.2 ACU
Unpack your SAILOR 100 Satellite TV ACU and check that the
following items are present:
• 1 x Ethernet cable (2 m)
• Power connector
• NMEA multi-connector
• Installation manual (this manual)
• User manual
SAILOR100TM.book Page 1 Tuesday, January 29, 2013 2:44 PM