Installation check list: Functional test in harbor
7-6 Chapter 7: Installation check 98-137654-A
7.4 Installation check list: Functional
test in harbor
Step Task Further information Done
1.
Check that the antenna is
tracking the satellite
The TV ready LED in the ACU
display must be steady green and
the display shows: TRACKING.
In the web interface and in the
Control Panel check:
DASHBOARD:
System status: Tracking
2.
Connect TV distribution
equipment, see the
installation instruction of the
TV distribution equipment
manufacturer.
Check for TV reception.
Table 7-4: Installation check list: Functional test in harbour
SAILOR100TM.book Page 6 Tuesday, January 29, 2013 2:44 PM