GE HEALTHCARE
DIRECTION FC091194, REVISION 11 VIVID 7 SERVICE MANUAL
Chapter 3 - System Setup 3 - 1
Chapter 3
System Setup
Section 3-1
Overview
3-1-1 Purpose of Chapter 3
This chapter contains information needed to install Vivid 7. Included is a procedure that describes how
to receive and unpack the equipment and how to file a damage or loss claim.
How to prepare the facility and unit of the actual installation, and how to check and test the unit, probes,
and external peripherals for electrical safety are included in this procedure. Also included in this section
are guidelines for transporting the unit to a new site.
3-1-2 Contents in Chapter 3
Table 3-1 Contents in Chapter 3
SECTION DESCRIPTION
PAGE
NUMBER
3-1 Overview 3-1
3-2 Installation Reminders 3-2
3-3 Receiving and Unpacking the Equipment 3-4
3-4 Packing Materials - Recycling Information 3-13
3-5 Preparing for Setup 3-14
3-6 Completing the Setup 3-14
3-7 . Configuration 3-28
3-8 Connectivity Overview 3-41
3-9 Connectivity Setup - Software v7.x (BT’08), v6.x, v5.x and v4.x 3-42
3-10 Connectivity Setup - Software v3.x 3-89
3-11 Connectivity Setup - Software v2.x 3-109
3-12 Ethernet Switch / Hub 3-133
3-13 Installation Paperwork 3-136