GE HEALTHCARE
DIRECTION FC091194, REVISION 11 VIVID 7 SERVICE MANUAL
4 - 82 Section 4-4 - Application Turnover Check List
Section 4-4
Application Turnover Check List
Complete these checks before returning the scanner to customer for use:
4-4-1 Software Configuration Checks
Section 4-5
Power Supply
4-5-1 Power Supply Test Procedure
4-5-1-1 Introduction
There is no need to do any special tests on the Power Supplies if there don’t seems to be a problem
that may be related to the Power Supplies.
4-5-1-2 Power Supply Adjustment
There are no adjustments on the power supplies. The DC Power is self-regulated. If a voltage is outside
the specified range, it means that something is wrong, either with the power supply itself or with a unit
connected to that specific power outlet.
Section 4-6
Site Log
Please use the Site Log found in Section 10-9 "Site Log" on page 10-27, or a similar Site Log, to record
site visits.
Table 4-45 Software Configuration Checks
STEP TASK
CHECK ( )
1.
Check Date and Time setting
2.
Check that Location (Hospital Name &
Department) is correct
3.
Check Language settings
4.
Check assignment of Printer Keys
5.
Check that all of the customer’s options are
correct installed