EasyManua.ls Logo

GE Vivid 7 - System Maintenance; Preliminary Checks

GE Vivid 7
858 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION FC091194, REVISION 11 VIVID 7 SERVICE MANUAL
10 - 6 Section 10-5 - System Maintenance
Section 10-5
System Maintenance
10-5-1 Preliminary Checks
The preliminary checks take about 15 minutes to perform. Refer to the system user documentation
whenever necessary.
Table 10-4 System Preliminary Checks
Step Item Description
1 Ask & Listen
Ask the customer if they have any problems or questions about the equipment.
2 Paperwork
Fill in the top of the Ultrasound Inspection Certificate, see page 10-25. Note all probes and system
options.
3 Power up
Turn the system power on and verify that all fans and peripherals turn on. Watch the displays during
power up to verify that no warning or error messages are displayed.
4 Probes
Verify that the system properly recognizes all probes.
5 Displays
Verify proper display on the monitor.
6 Presets
Backup all customer presets on an empty and formatted MO Disk (prefered) or to an empty CD-R
disk.

Table of Contents

Related product manuals