EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK 5250L

Manitowoc Grove GMK 5250L User Manual

Manitowoc Grove GMK 5250L
958 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #296 background imageLoading...
Page #296 background image
Driving modes and rigging for on-road driving
6.3 Rigging work for driving with a dolly
6 - 14 3 302 633 en Operating Instructions GMK5250L
27.09.2017
6.3.3 Switching on boom pre-tensioning
If the main boom has been set down on a dolly, you can change the axle
loads on the rear axle lines by switching on the boom pre-tensioning.
• Switch on the boom floating position;
à p. 6 - 13.
The valves
II and III are located underneath
the pressure gauge (1).
• Close the valve II – the lever (2) is horizontal.
• Open the valve III – the lever (3) points
upward.
You can now fill the pressure accumulator.
• Press button (4) in.
The pressure accumulator is now filled.
• Fill up the pressure accumulator until the
pressure stops rising on the pressure
gauge (1).
• Close the valve III – lever (3) points down.
The valve
II stays closed – lever (2) is horizontal.
Now the boom pre-tensioning is switched on.
4

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals